Skip to content

UTILITIES & VAULTS

For all civic and commercial projects requiring utility and concrete vaults, Hyland can deliver on-time, on-island a wide range of products for service vaults and utilities products utilized by BC Hydro, Telus, Shaw, Fortis BC and the Ministry of Transportation.

Advantages of Hyland Utilities & Vaults

  • On-island production
  • Inventory available for pick up or delivery
  • Reduced transportation costs
  • Vaults such as 5686 can be customized to suit cut-out specifications
  • Lift Inserts for safe transportation and installation

Service Boxes

Types and Technical Drawings

1.5 m x 1.5 m Vault

Lampstands

Types and Technical Drawings

Service Boxes

Lampstands

Sign Bases